FAQ

What Are The Available Shipping Methods?

Port location: Ningbo or Shanghai, China Shipping to: Worldwide Shipping method: by sea, by air, by express Estimated delivery dates depend on specific order list, shipping service selected and receipt of cleared payment. Delivery time may vary.

How To Control The Quality Of Products?

Products Material: Strictly control the material used, make sure they can meet international requested standards., and maintain long work life.
Semi-finished products inspection:We examine the products 100% before finished. Such as Visual Inspection, Voltage test, resistance test, Laps test, Electric Strength Test, and so on.
Production line Test: Our engineers will inspect machines and lines at fixed period.
Finished Product Inspection: We do the test according to ISO9001-2015, Visual Inspection, Voltage test, resistance test, Electric Strength test, Insulation test etc.
QC team: We have a professional and mature QC team to make sure products 100% pass, and maintain long work life.

How Long Is The Product Date Of Delivery Probably?

The different product, as well as the different run quantity can affect the date of delivery, but in ordinary circumstances product date of delivery about 30 days. Most of products have stock, contact us anytime to get more information.

How To Custom-Made (OEM/ODM)?

If you have a new product drawing or a sample, please send to us, and we can custom-made the product as your required. We will also provide our professional advices of the products to make the design to be more realized & maximize the performance.

How About The Mini Order Quantity?

We don't have strict requirments on most items, due to we have stock. More information can send us the enquiry list, we check and reply you. For custom-made, MOQ will be adviced due to the specific product.

Top